INDUSTRIAL AND INFRASTRUCTURE | PRIVATE WORKS | ALL
Work: Refinor plant storm drains
Description: trench excavation work for the placement of Hº diameter pipes 400, 600, 800 y 1000 mm.(soil type = clayey silt). Subsequent filling and compaction with soil from the excavation. Execution of Hº Aº camars.
Project Information
Surface: 2600 ml of pipes
Year of execution: 2008
Location: Provincial route 306 km 6 Salí River Band, Province of Tucumán