Work:ACA US OJO DE AGUA SERVICE STATION – SANTIAGO DEL ESTERO
Description: Renovation and new extension of existing built box. Liquid fuel loading bay with installation of a new tank and hydraulic installation and APE for 6 buried tanks. Access and loading bay with Hº Aº pavement. Sewage waste treatment plant and drilling and equipment for deep water well.
Project Information
- Surfaces: built box 300 m2 / Beach Eaves: 260 m2 / Hº Aº Flooring: 2.200 m2
- Year of execution: 2019
- Location: Santiago del Estero
- Investment: $ 59.261.321,10 Ars
- Execution time: 4 months
Share on:


