Location: San Juan Street (no number), La Rinconada, Yerba Buena, TUCUMÁN Province
Clients: IPV and DU
Description: 80 Single family units distributed over four blocks.
Building of infrastructure consisting of streets with shoulders, street lights, electric grid with a transformer station, providing a drinkable water from wells with an electric pumps and a sewage system that connects to the city sewage system and a natural gas network with connections to each home.
Project site: 3400 m²
Time for completion: 270 days in 2007