50 single-family homes, infrastructure works including a drinkable water system and an electric grid, street lights, a roadway system, storm drains, sewage drains, pedestrian walkways, urban woodland, green spaces.
Time for completion: 12 months
50 single-family homes, infrastructure works including a drinkable water system and an electric grid, street lights, a roadway system, storm drains, sewage drains, pedestrian walkways, urban woodland, green spaces.
Time for completion: 12 months