45 single-family homes, infrastructure works including a drinking water system and an electric grid, Street Lights, a roadway system, storm drains, sewage drains, pedestrian walkways, urban woodland, Green spaces.
Time for Completion: 12 months
45 single-family homes, infrastructure works including a drinking water system and an electric grid, Street Lights, a roadway system, storm drains, sewage drains, pedestrian walkways, urban woodland, Green spaces.
Time for Completion: 12 months